Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 33 results ...

Abubakar, M E, Hasan, A and Jha, K N (2022) Delays and Financial Implications of COVID-19 for Contractors in Irrigation Projects. Journal of Construction Engineering and Management, 148(09).

Adibfar, A and Costin, A M (2022) Creation of a Mock-up Bridge Digital Twin by Fusing Intelligent Transportation Systems (ITS) Data into Bridge Information Model (BrIM). Journal of Construction Engineering and Management, 148(09).

Alqahtani, F K, Alkhaldi, M, Alsaqer, T, Abotaleb, I S, Mohamed, A G and Dirar, S (2022) A Comparative Assessment of Advanced Construction Systems Incorporating Green Concrete. Journal of Construction Engineering and Management, 148(09).

Besaiso, H and Fenn, P (2022) How International Construction Arbitrators Make Their Decisions: Status of Commercial Norms and International Construction Law. Journal of Construction Engineering and Management, 148(09).

Cadenazzi, T, Keles, B, Rahman, M K and Nanni, A (2022) Life-Cycle Cost and Life-Cycle Assessment of a Monumental Fiber-Reinforced Polymer Reinforced Concrete Structure. Journal of Construction Engineering and Management, 148(09).

Cao, Q, Zou, X and Zhang, L (2022) Multiobjective Robust Optimization Model for Generating Stable and Makespan-Protective Repetitive Schedules. Journal of Construction Engineering and Management, 148(09).

Dayan, V, Chileshe, N and Hassanli, R (2022) A Scoping Review of Information-Modeling Development in Bridge Management Systems. Journal of Construction Engineering and Management, 148(09).

Franz, B, Leicht, R, El Asmar, M and Molenaar, K (2022) Methodological Consistency for Quantitative Analysis and Reporting in Project Delivery System Performance Research. Journal of Construction Engineering and Management, 148(09).

García de Soto, B, Turk, Å, Maciel, A, Mantha, B, Georgescu, A and Sonkor, M S (2022) Understanding the Significance of Cybersecurity in the Construction Industry: Survey Findings. Journal of Construction Engineering and Management, 148(09).

Guo, D, Song, Z, Xu, T, Zhang, Y and Ding, L (2022) Coupling Analysis of Tunnel Construction Risk in Complex Geology and Construction Factors. Journal of Construction Engineering and Management, 148(09).

Hasan, A and Kamardeen, I (2022) Occupational Health and Safety Barriers for Gender Diversity in the Australian Construction Industry. Journal of Construction Engineering and Management, 148(09).

Kamma, R C and Jha, K N (2022) Quantifying Building Construction and Demolition Waste Using Permit Data. Journal of Construction Engineering and Management, 148(09).

Lasni, A and Boton, C (2022) Implementing Construction Planning and Control Software: A Specialized Contractor Perspective. Journal of Construction Engineering and Management, 148(09).

Lee, G and Lee, S (2022) Importance of Testing with Independent Subjects and Contexts for Machine-Learning Models to Monitor Construction Workers’ Psychophysiological Responses. Journal of Construction Engineering and Management, 148(09).

Liu, D, Hu, C, Guo, S and Yu, J (2022) . Journal of Construction Engineering and Management, 148(09).

Liu, J, Liu, J and Bu, Z (2022) Effects of Different Face-Saving Concerns on the Escalation of Commitment between State-Owned and Private Investors in PPP Projects. Journal of Construction Engineering and Management, 148(09).

Liu, M, Zhu, Y, Wei, J, Le, Y and Zhang, X (2022) Impact of Institutional Pressures on External Program Manager Involvement: Evidence from Large Projects in China. Journal of Construction Engineering and Management, 148(09).

Luo, L, Wu, X, Hong, J and Wu, G (2022) Fuzzy Cognitive Map-Enabled Approach for Investigating the Relationship between Influencing Factors and Prefabricated Building Cost Considering Dynamic Interactions. Journal of Construction Engineering and Management, 148(09).

Meng, Q and Zhu, S (2022) Construction Activity Classification Based on Vibration Monitoring Data: A Supervised Deep-Learning Approach with Time Series RandAugment. Journal of Construction Engineering and Management, 148(09).

Naji, K K, Gunduz, M and Naser, A F (2022) The Effect of Change-Order Management Factors on Construction Project Success: A Structural Equation Modeling Approach. Journal of Construction Engineering and Management, 148(09).

Okudan, O and Çevikbaş, M (2022) Alternative Dispute Resolution Selection Framework to Settle Disputes in Public–Private Partnership Projects. Journal of Construction Engineering and Management, 148(09).

  • Type: Journal Article
  • Keywords: Alternative dispute resolution (ADR); Public–private partnership (PPP) projects; Dispute management; Dispute resolution; Fuzzy AHP; Integrated fuzzy AHP; Fuzzy TOPSIS;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0002351
  • Abstract:
    Effective use of alternative dispute resolution (ADR) methods is critical because disputes are one of the biggest concerns in public–private partnership (PPP) projects. However, decision makers still struggle to implement ADR effectively due to limited knowledge about selecting the most appropriate ADR method that meets the needs of their PPP projects. Although some research has been conducted to develop approaches for ADR selection, most of these studies ignored critical points such as PPP projects and inherent characteristics of disputes. Moreover, fuzzy set logic and integrated multicriteria decision-making (MCDM) methods have not usually been chosen in these studies, posing various limitations. This study aimed to bridge these gaps by proposing a decision support framework for decision makers in selecting the most appropriate ADR method to settle disputes in PPP projects. Initially, an in-depth literature review was conducted to design the initial version of the framework. Then, the focus group discussion (FGD) sessions were organized and subject matter experts refined the draft framework. In total, a list of 16 selection factors and 30 dispute types were identified through literature review and the FGD sessions. At the final step, fuzzy analytic hierarchy process (AHP) and integrated fuzzy AHP and fuzzy TOPSIS were performed to determine the priority of each ADR method for each dispute scenario. Results showed that ADR selection is strongly influenced by inherent characteristics of dispute types. In other words, an ADR method cannot settle all dispute types, and thus, inherent characteristics of dispute types should also be considered during the ADR selection. Second, dispute management in PPP projects necessitates project-specific approaches. Thus, decision makers should not rely fully on standard contract forms such as those of the International Federation of Consulting Engineers (FIDIC). By developing a specific ADR selection framework for PPP projects by considering dispute types, this study significantly contributes to the theory of ADR domain and has important managerial implications.

Pan, M, Yang, Y, Zheng, Z and Pan, W (2022) Artificial Intelligence and Robotics for Prefabricated and Modular Construction: A Systematic Literature Review. Journal of Construction Engineering and Management, 148(09).

Qiao, J, Wang, C, Guan, S and Shuran, L (2022) Construction-Accident Narrative Classification Using Shallow and Deep Learning. Journal of Construction Engineering and Management, 148(09).

Tang, L, Chen, C, Li, H and Mak, D Y Y (2022) Developing a BIM GIS–Integrated Method for Urban Underground Piping Management in China: A Case Study. Journal of Construction Engineering and Management, 148(09).

Tavallaei, R, Mashayekhi, A, Harrison, N, Talebian, M and Moser, R (2022) BIM Adoption: A Case of Institutional Pressures and Top Management Support. Journal of Construction Engineering and Management, 148(09).

Tayebi Jebeli, M, Asadollahfardi, G and Abbasi Khalil, A (2022) Novel Application of Micro-Nanobubble Water for Recycling Waste Foundry Sand: Toward Green Concrete. Journal of Construction Engineering and Management, 148(09).

ter Huurne, R, Scholtenhuis, L O and Dorée, A (2022) Change Triggers in Early Innovation Stages: How Technology Pilots Enable Routine Reflection. Journal of Construction Engineering and Management, 148(09).

Tian, D, Liu, H, Chen, S, Li, M and Liu, C (2022) Human Error Analysis for Hydraulic Engineering: Comprehensive System to Reveal Accident Evolution Process with Text Knowledge. Journal of Construction Engineering and Management, 148(09).

Xu, Z, Liang, Y, Xu, Y, Fang, Z and Stilla, U (2022) Geometric Modeling and Surface-Quality Inspection of Prefabricated Concrete Components Using Sliced Point Clouds. Journal of Construction Engineering and Management, 148(09).

Yu, W, Wang, K and Wu, H (2022) Empirical Comparison of Learning Effectiveness of Immersive Virtual Reality–Based Safety Training for Novice and Experienced Construction Workers. Journal of Construction Engineering and Management, 148(09).

Zhang, J, Zhou, Q, Li, F and Zhang, S (2022) Case Study of Field Application of Prefabricated Anchoring Frame Beam Structure in Slope Supporting Projects. Journal of Construction Engineering and Management, 148(09).

Zhang, S, Bogus, S M, Lippitt, C D, Kamat, V and Lee, S (2022) Implementing Remote-Sensing Methodologies for Construction Research: An Unoccupied Airborne System Perspective. Journal of Construction Engineering and Management, 148(09).

Zhang, W, Yuan, G, Xue, R, Han, Y and Taylor, J E (2022) Mitigating Common Method Bias in Construction Engineering and Management Research. Journal of Construction Engineering and Management, 148(09).